Description: Stage contract for day to day maintenance general up keeping during the financial year 2025 26 upto March 2026 on all main roads allied links and buildings from Bohri to Canal Head Name of Work Stage contract for day to day maintenance general upkeeping during the financial year 2025 26 upto March 2026 on all main roads allied links buildings from Bohri to Canal Head
Details: Enaging labour for cutting patches in proper shape / shifting of material and other allied works for Day to day maintanance Enaging Safai Karamchari for removing unhygenic mulba from the chowked drains and mulba dumps and disposal Enaging Gardner (mali) for cutting of branches of trees and pruning of shrubs Surface dressing of ground including removing vegitation and inequalitiesnot exceeding 15 cm in depth and disposal of , lead upto 50 mtr and lift upto 1.5 mtr Clearing jungle including uprooting of rank vegitation, grass, brush wood, tressat a height of 1 m above ground and removal of upto a distance of 50 m outside the periphery of the area cleared. Removing unhygienic materials from designated site to dumping site. Applying priming coat:With ready mixed red oxide Zinc Chromate primer of approved brand and manufacture on steel galvanized iron/steel works Applying one coat of water thinnable cement primer of approved brand and manufacture Applying priming coat:With ready mixed pi
Sector: PWD