Description: Constt of Community soakage Pit at Name of Work Construction of Community soakage Pit at Baba Pora Aloosa Block kralpora Pyt Aloosa for year 2025 26 NIT No Xen Rew Kup 2025 2026Dated 2025 Adv Cost 1 95Lacs
Details: Earth work in excavation by Manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge,All kinds of soil : Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material, 1 All kinds of soil : Dry random rubble masonry with hard stone in foundation including head load R/R stone masonry with hard stones in cement mortor 1: 6 in foundation including head load. Providing and laying in position specified grade of reinforced cement concrete1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size): including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete, Thermo-Mechanically Treated bars of gr
Sector: RDPR