Description: Construction of Road From main road Mandi Phagla Buffliaz Km 7th to Peer Fazal Shah Ziyarat via Mohalla Kumarah Surankote Part 1st by way of Earth Work in Cutting Cross Drainage Walling Providing and Laying of 150 mm thick WBM Grade II 75mm thick W Name of Work Construction of Road From main road Mandi Phagla Buffliaz Km 7th to Peer Fazal Shah Ziyarat via Mohalla Kumarah Surankote Part 1st by way of Earth Work in Cutting Cross Drainage Walling Providing and Laying of 150 mm thick WBM Grade II 75mm thick WBM Grade III 50 mm thick BM and 25 mm thick OGPC in Km 0 RD 0 to Km 2nd RD 600 Under NABARD RIDF I Earth Work Km 1st RD 0 to Km 2nd RD 500 L 1 50 Kms II Hume Pipe Culverts As Per Location III RCC Culverts As Per Location IV Walling As Per Location V Protection Work As Per Location
Details: Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas ( exceeding 30cm in depth, 1.5 m in width as well as 10 sqm on plan ) including disposal of excavated earth, lead up to 50m and lift upto 1.5 m, as directed by Engineer-in-Charge. Classification of soil All kinds of Soil 50% ,Ordinary Rock = 30% & Hard rock =20%(Blasting prohibited ) Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering . All work up to plinth level with :1:5:10 ( 1 cement
Sector: PWD