Details: cleaning of choked/blocked surface drain by way of removing vegetations, deposited silt/slush by all means including opening the eyes of trash guards wherever required and disposal of malba from the road sides to outside municipal limits by using mechanical transport involving all loading and unloading, all complete as per the directions of engineer-in-charge clearing grass and removal of vegetation and removal of the upto a distance of 50 m outside the periphery of the area cleared. demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-in- charge: (1:3:6 or richer mix) taking out existing kerb stones of all types from footpath/ central verge, including removal of mortaretc.,disposal of unserviceable material to the dumping ground, for which payment shall be madeseparately and stacking of serviceable material within 50 meter lead as per direction of engineer-in-charge dismantling of flexible pavement
Sector: PWD