Details: cleareance of site by way of removing garbage humps extracting of bushes by mechanical/ manual means incl. dismantling and removal of concrete blocks from site for laying of layout for proposed building. earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: all kinds of soil : providing and laying of dry stone soling (90-45mm) (hand packed tightly ) in foundation trenches consolidated and ramming, including all leads, lifts all carriage complete job . providing and laying in position cement concrete of specified grade excl. the cost of centring and shuttering all work up to plinth level 1:4:8 (1 cement : 4 coarse sand :
Sector: PWD