Description: Development of Park at Mohalla Nema Sahab near the Shrine of Syed Nematullah Sahab Name of Work Development of Park at Mohalla Nema Sahab near the Shrine of Syed Nematullah Sahab
Details: Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.All kinds of soil : Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter fromcutting edge All kinds of soil : Providing and laying of stone soiling dully hand packed including carriage of stone soling with loading unloading and stacking complete. Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded s
Sector: PWD