Description: SITC of D G set Horizontal Multistage pumping unit along with allied works and Submersible pumping unit with electro mechanical works for Bore well No 105 under National Mission on Saffron Name of Work SITC of D G set Horizontal Multistage pumping unit along with allied works and Submersible pumping unit with electro mechanical works for Bore well No 105 under National Mission on Saffron
Details: Part "A" Horizontal Pumping Units Supply, Installation, Testing and Commissioning of Horizontal pumping unit coupled with suitable size motors including1. Pump2. Motor.3. M S Base Frame4. Coupling (MS&TC)5. Anti vibration pads with specification and bore well as mentioned below: Bore Well No: 105 Bangund Chadoora Discharge: 13.50 M³/hr , Head: 135 m Part "B" (Allied Works) Providing & Laying of cement concrete foundation block for pumping equipments of dimensions not less than 6' x 2' x 1' (as per site requirement) in the ratio of 1:2:4 ( 1 cement : 2 coarse sand : 4 stone aggregate of 20 mm nominal size). This also includes suitable size concrete saddle block for support of suction pipe. The job includes shuttering, centering & providing & fixing of foundation bolts. Supply, Fitting, Testing & Commissioning of flanged G.I. "B" Class suction/delivery pipe of size 80 mm. Includes washers, nuts and bolts. Supply, Fitting, Testing & Commissioning of 80mm, PN-1.6/16, Ductile Iron
Sector: PWD