Details: taking out of geotagged photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. surface dressing of ground including removing vegetation and inequalities, not exceeding 15cm deep and disposal of the beyond smc limits in all kinds of soils including all its leads, lifts, loading, unloading, head load (if any) costs & carriages etc., complete. scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1km by mechanical means. earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated material and carriage and disposal of surplus excavat
Sector: Urban Authority