Details: slip clearance / drain clearance in soils; mixed with moorum/kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. disposal of surplus mulba by mt for an av distance 1.00kms extra for additional lead per km beyond 1.00kms providing and laying of nallah bed material by providing close graded material conforming to specifications, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader / manually on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of engineer-in-charge including cutting the patch in proper shape and size (nsi) surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of , lead upto 50 m and lift upto1.5 m in -all kinds of soil. clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and sapl
Sector: PWD