Description: Macadamization of Trich inner links by way of 75mm WBM G II in patches Stretches 25mm thickWMM Tack coat 50 mm bituminous macadam 25 mm thick semi Dense 6mm bituminious concrete and 6mm thick seal coat Machine mix laid by Paver Name of Work Macadamization of Trich inner links by way of 75mm WBM G II in patches Stretches 75mm thickWMM Tack coat 50 mm bituminous macadam 25 mm thick semi Dense bituminious concrete and 6mm thick seal coat Machine mix laid by Paver
Details: Supplying and stacking of graded stone agg. at site of size range 63-45mm Grade-ll with stone screening/ chippings 11.2mm size nominal size type B stone dust moorum at site incl. all carriage and laying water bound macadam with specified stone agg. stone screening and binding material incl. screening, sorting ,spreading to template and consolidation with PRR with 8-10 tonne capacity etc. complete job (75 mm compacted thickness (MORTH) specifications Providing and laying spreading compacting_ graded |stone aggregate to wet macadam specification including preparing the material with water at OMC in mechanical mixing plant laying in uniform layers with paver in base course on well prepared surface and compacting with roller to achieve to required grade and camber including carriage of material involved to site of work complete crusher got from broken quarry metal grading 45mm to 22.4mm +30%22.40mm to 2.36 mm 40%2.36 to 75mm complete Providing and applying tack coat using bitumen emulsio
Sector: PWD