Description: Please refer in BOQ Name of Work Restoration of roads by way of removal of slips drain clearance hand packing stones during the year 2025 26 for i Kishanpur to Ghatt via Koti road L 7 0 km ii Billawar Sukrala road and Phinter Billawar road L 16 0 km iii Phinter Kishanpur road and Mohalla Patyari L 6 0 km iv Tilla Bather road and Beril link road L 7 5 km v Dewal to Dharamkote via Surara road L 3 0 km Under Non Plan
Details: Engagement of Earth Excavator 75 H.P For removal of Slips and Drain Clearance and disposal of same out side the peripheri of areas cleared by engaging tracotr/trolly wherever required (all inclusive including POL) as per the Direction of Engineer - in Charge.(LMR) Hand-packing stones in wire-crates including cost of crates and stones Carriage of material by Mechanical Transport including loading / unloading and stacking at site complete. Stones / boulders for an average lead of 7.00 Km. Providing ,laying,spreading and compacting graded stone aggregate (range 53mm to 0.075mm) to Wet Mix Macadam (WMM) specifications including premixing the material with water at OMC in Mechanical Mix plant, carriage of mixed material by Tipper to site, for all leads and lifts, laying in uniform layers with mechanical paver finisher in sub base/base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per spe
Sector: PWD