Details: clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared. supply of machinery/jcb including pol for maintenance of road as directed by engineer-in-charge. engaging of labour for general upkeeping of different roads. supply and laying of river bed materials including leveling, dressing, watering & consolidation in layer 20cm in depth each layer consolidated with power road roller of minimum 8 tonne capacity incl. carriages complete providing and laying non-pressure of specified class r.c.c. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. non-pressure np-3 class (medium duty) r.c.c. pipes, 600 mm dia. r.c.c. pipes hand-packing stones in wire-crates of mechanical woven double and twiste
Sector: PWD