Details: slip clearance in soils; mixed with moorum/kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. drain clearance in all kind of soil including its disposal upto 3 km clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared. supply of machinery/jcb including pol for maintenance of road as directed by engineer-in-charge. engaging of labour for general upkeeping of different roads. supply and laying of river bed materials including leveling, dressing, watering & consolidation in layer 20cm in depth each layer consolidated with power road roller of minimum 8 tonne capacity incl. carriages complete providing and laying non-pressure of specified class r.c.c. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including
Sector: PWD