Details: earth work in excavation in foundation by manual means over areas(exceeding 30 cm in depth and up to 1.50m depth 1.50 m in width as well as 10 sqm on plan ) , including disposal of excavated earth upto i metre for cutting of edges ,disposal earth to be leveled and neatly dressed.all kinds of soil. providing & laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. all works up to plinth level in m-7.5(1:4:8) grade, with 40mm nominal size incl all carriages of material providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.all works upto plinth level in m-15(1:2:4) grade, with 20mm nominal size incl all carriages of material rcc work in plinth ,walls, incld. attchd pilasters, buttresses plinth & string courses, columns, pi
Sector: PWD