Details: filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. slit clearnce in soils; mixed with moorum/kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. shingle clearance from canals clearance fromk canals (including extraction of roots) hand-packing stones in wire-crates; excluding cost of crates and stones dumping stone excluding cost of stones. in horizontal on level filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. loading/unloading sand/ earth filled bags in lorries; lead upto 50m hydraulic excavator (3d) with driv
Sector: Irrigation