Description: Refer to BOQ Name of Work Construction of Boundary wall at Govt High School Cherji
Details: Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Centering and shuttering including strutting propping etc and removal of form work for : reatining walls return walls , walls (any thickness) including attached pilasters , buttresses , plinth and string course fillets , kerbs and steps etc. Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement
Sector: PWD