Details: demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of engineer-in-charge: in lime mortar with old mughal bricks (removal/ dismantalling) demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) (removal/ dismantalling) earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: p/l stone boulders of 75mm to 100 mm in size including ramming watering complte job laying fibre reinforced m30 grade (1:cement/1:sand/3:aggregate), upto
Sector: PWD