Description: Construction of Elementary Wall at M S Nomalli Zone Arnas under PAB 2023 24 Name of Work Construction of Elementary Wall at M S Nomalli Zone Arnas under PAB 2023 24
Details: Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: all kind of soil Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level in M-10(1:3:6) grade, with 20mm nominal size of Crushed stone aggregates,with 20% boulders. Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering
Sector: PWD