Details: clearing jungle including uprooting of rank vegetation grass, brush wood, trees, and sapling of girth upto 30cm meausred at height of 1m above ground level and removal of upto a distance of 50m outiside the pheriphery of the area cleared. earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, including dressing of site and ramming of bottoms lift upto 1.5mtr. including getting out excavated earth and disposal of surplus excavated earth as directed. all kinds of soil. 1 meter from cutting edge
Sector: Water supply and Sewerage