Description: Servicing and reconditioning of 100 HP ATS modular control panels at LIS Baghichetkak of MISD Sopore Name of Work Servicing and reconditioning of 100 HP ATS modular control panels at LIS Baghichetkak of MISD Sopore Adv Cost 0 314 Lacs
Details: Mechanical transportation, loading, unloading and handling of 100HP ATS (Modular control panel) using appropriate means of transport viz., Load carrier upto a lead of 35Km per trip. Isolating and disconnecting of all incoming and outgoing leads from autotransformer starter. Taking out the damaged autotransformer coil assembly from oil tank. Dismantling and extraction of electrical contractor (03 No.) single phase preventer, overload relay, timers, voltmeters, ammeters, selector switches, axillary wiring etc by way of unplugging and removal of nut bolts, tappings by skilled workers. Servicing and reconditioning of all electrical parts of FASD Starter panel viz., contactors, meters, single phase preventer, busbar, timers etc with the application of petrol by high pressure jet gun to remove dirt, grit, grime and water moisture. Then applying chemical acetone and drying up of all electrical items in heating chamber. The job is to be executed by skilled workers with required tools viz., s
Sector: Irrigation