Details: demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge:all kinds of soil : removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive dumping stone including cost of stones. on horizontal on level. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering . all work up to plinth level with :1:5:10 ( 1 cement :
Sector: PWD