Details: dismantling and stacking within 50 meters lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of t or l iron or pipe labour for removing and stacking chain link fencing as directed complete. earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: all kinds of soil : providing/laying of dry stone soling, tightly hand packed including all carriages complete job providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: m-7.5 mix using nallah aggregate incl all costs and carri
Sector: PWD