Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:in akos providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering, all work upto plinth level (1:5:10) 1 cement:5 coarse sand:10 graded stone aggreagate 40mm nominal size (crusher) providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering, all work upto plinth level (1:3:6) 1 cement:3 coarse sand:6 graded stone aggreagate 20mm nominal size (crusher) providing and laying of river bed material (r.b.m)/ nallah bed material (n.b.m) including spreading, consolidation complete in all respect including loading, unloading an
Sector: RDPR