Description: Construction Of Dak Banglow Guest House At Hajin Bandipora Under FC Grants 2022 23 Balance Work Name of Work CONSTRUCTION OF DAK BANGLOW GUEST HOUSE AT HAJIN BANDIPORA UNDER FC GRANTS 2022 23 Balance Work
Details: Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres in All kinds of soil Pumping out water ensured by springs, tidal or river seepage, broken water mains or drains the like. (The watertable at the executed site is very high hence pumping out of water may be required at site during execution of Septic Tanks and Soakage Pit) Note:- Incase authorization for dewatering item is not received from MC Hajin, (It is pertinent to mention that various correspondances vide this office letter No:-R&B/Sbl/23/6793-95, Dated:-01-03-2024 and letter No:-R&B/Sbl/24/7811-14, Dated:-11-01-2025 and other correspondances were addressed to MC Hajin
Sector: PWD