Details: taking out of geotagged photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared including all leads, lifts, loading, unloading, head load (if any) all costs and carriages complete. clearance of silt in (wet) and accumulated mulba/ vegetation/ weeds and disposal of same beyond smc limits including all leads, lifts, loading, unloading, head load (if any) all costs and carriages complete. construction of temporary/ kacha/ paka drain for diversion of water/ spring during execution of work including all leads, lifts, loading, unloading, head load (if any) all costs and carriages complete. earth work in bulk excavation by manual means in t
Sector: Urban Authority