Details: replacement of oil seals to the end carriages drive unit complete by opening and fixing the gear box after fixing the oil seals a) ps tank 4 nos b) c.f.tank 4 nos c) floculator paddle and drive gears = 4 nos d)flash mixer paddle & drive gears = 6 nos dismantling /renovation of alum dosing soulation tank with suitable dissolving trace of rcc of existing size with pcc plateform for operation and inspection complete. the job includes providing 50 mm dia pvc solinite pipes and valves for dosing,drain,interconnection pvc pipes langes, socket, elbows etc.complete job. replacement ofworkout sludges scrapper assesmbly- (bottom portion) made out of m.s. angle/ channel of size has already existing for scrapping of sludge complete including nuts, bolts,washers and paiting wth corresive paint). the job also includge providing and fixing of ms chequered plate as w
Sector: Water supply and Sewerage