Details: slip clearance in ordinary soils in soils; mixed with moorum/kankar/ shingle/ boulders; in soils; mixed with decomposed rocks; by blasting or any other means in medium hard rocks ; by blasting in hard rocks; by blasting earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms including getting out excavated earth and disposal of surplus excavated earth as directed, with in a lead of 50 metres. all kinds of soil ordinary rock hard rock (requiring blasting ) hard rock (blasting prohibited ) earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not xceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including
Sector: PWD