Details: engagement of labourers for clearance of site etc dismantling damged tile work in floors and roofs including stacking material within 50 meters lead. demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-in- charge:1:3:6 or richer mix (i/c equivalent design mix earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed all kids of soil providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) form work centering / shu
Sector: Urban Authority