Details: engagement of labourers for clearance of site etc dismantling damged tile work in floors and roofs including stacking material within 50 meters lead. as per directions of engineer incharge. demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-incharge 1:4:8 or leaner mix (i/c equivalent design mix) providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) refitting of tiles laid over & including 50 mm thick sand cushion/ duly compacted including all sorts of carriages by all means of transport upto site of work complete job. providing and laying 50mm thick rubber moulded interlocked tiles of required shade laid over & including 50 mm thick sand cushion including all carriages complete job as directed at site by
Sector: Urban Authority