Details: earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in with) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting ouf excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: all kinds of soil: filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. providing and laying of dry stone soling by way of nallah boulders size on level (hand packed) watering, ramming, complete below foundation and rooms incl. carriage of all materials providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering incl. all carriages of material to site of work 1:4:8 (1
Sector: PWD