Details: earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge in all kinds of soils providing and laying of hand packed stone boulder (size 150mm-230mm) before laying of pcc compacted consolidated rammed filling the voids compacting all complete including carriage and head loads upto site of work complete job. supplying and filling in plinth with fine sand under floors including, watering, ramming, consolidating and dressing complete. filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. extra rates for quantities of works executed :in or under water and/ or liquid mud, including pumping out water as required
Sector: PWD