Details: “design, engineering, providing, welding, laying/fixing in proper position, testing and commissioning of 630mm diameter hdpe raw water intake pipeline in nigeen lake from proposed offtake point near ashai bagh bridge up to the sump (delivery point) of stage 1st pumping station of wss pokhribal located at northern bank of nigeen lake under amrut 2.0, including successful trial run for a period of one month on turnkey/epc basis”. the scope shall include all necessary ancillary works such as jointing, pipe supports, alignment, placing in proper position in and under water, leak testing, hydro testing, required appurtenances, and restoration of site conditions to original or improved state, as applicable.
Sector: Water supply and Sewerage