Details: earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: all kinds of soil : hand packing of stones in wire crates including cost of stones and t wire crates ( 6.00x1.20x1.20 )mtr. filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. backfilling by way of providing, laying, spreading, watering and compacting in layers not exceeding 200 mm thick with 8-10 kn tonne capacity road roller, rbm material free of organic material mixed with coarse aggregate/ roun
Sector: PWD