Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter fromcutting edge all kinds of soil : supplying and stacking at site graded crushed stone aggregate of size 63 mm to 45 mm dumping stone excluding cost of stones. in horizontal on level. dry random rubble masonry with hard stone in foundation and plinth: without bond stone providing and fixing on wall face un-plasticized rigid pvc rain water pipes conforming to is: 13592 type a including jointing with seal ring conforming to is: 5382 leaving 10 mm gap for thermal expansion. single socketed pipes 75 mm diametre carriage of stone 750 mtrs by h/l cib (citizen information board ) size 4'0"x5'0"x0'9" (above plinth level) with t
Sector: RDPR