Details: felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. beyond 60 cm girth upto and including 120 cm girth. earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: all kinds of soil /boulders providing and laying stone solling/gsb nallah makh/quarry makh or 2nd class sand in foundation treches / inside plinth including compacting, watering including all material complete. filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in
Sector: PWD