Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge in all kinds of soil hand-packing stones in wire-crates; excluding cost of crates and stones extra for every additional lift of 1.5 m or part there of beyond 1.5 m height for hand-packing of stones in wire-crates dumping stone excluding cost of stones. in horizontal on level behind r/wall and in crates supply of stone boulders nallah nominal size 225 mm stack measurment reduced by 15 % cost of wire crates including carriages all complete lmr carriage of stone from an average distance of 8kmby mt
Sector: PWD