Details: earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil : dry random rubble masonry with hard stone in foundation and plinth: without bond stone providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) centering and shuttering including strutting, propping etc. and removal of form work for : foundations, footings, bases for columns carriage of ca from avg distance of 40 km m/t and 600 mtr h/l carriage of stone from avg. distance of 600m h/l carriage of sand by mt 40km and 500 mtrs by h/l cib (citizen information board ) size 4'0"x5'0"x0'9" (above plinth level) with tepered top having 20 degree in
Sector: RDPR