Details: earthwork in excavation by manual means not exceeding 30cm in depth ,1.5m in width 10 sqm on plan, including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in a.k.s.70% and o/rock 30% providing and laying m5 grade incl curing but excl cost of centering and shuttering. all work upto plimth level. providing and laying m10 grade incl curing but excl cost of centering and shuttering.all work upto plimth level. centering and shuttering including strutting,propping etc and removal of form work structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. providing corrugated g. s. sheet roofing including vertical/curved surface fixed with polymer coated j or l hooks, bolts and nuts 8mm diameter including cutting to size and shape wherever required. 0.63mm thick with zinc coating providing and laying m15 gr
Sector: RDPR