Details: site clearence including removing vegetation and inequalities , roots, saplings etc earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:all kinds of soil supply and placing of stone soling hand packed tightly in bed including all carriages p/l in position c.c of specified grade excluding the cost of centring and shuttering 1: 3: 6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size). p/l of plums including all carriages p/f centring and shuttering including strutting, propping etc. and removal of formwork complete job carriage of material by mt of 20 km lead sand/aggregate carriage of cement and shuttering provision for signboard & photographs
Sector: RDPR