Details: earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed. providing and laying of dry soling hand packed includingramming and all carriages/leads and lifts and plum cement concrete (cast-in-situ)providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with:4.4.7 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) cement concrete (cast-in-situ)providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with:4.4.5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) brick work with fps bricks of class designatio
Sector: RDPR