Details: engagement of labours for site clearance by removing bushes vegetation earth work in excavation by manual means in trenches for foundations,drains,pipes,cables etc(not exceeding 1.5m in width) and for shafts wells,cesspits and the like not exceeding 10 sqm on plain including dressing of sides and ramming of bottoms lift upyo 1.5 m including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil lead upto 25 mts p/l of hand packed stone soling i/c carriage from approved source to site off work p/l in position cement concrete of specified grade i/c curing but excluding cost of centering shuttering.all work upto plinth level mix with 20mm n/s of stone agg.1;3;6 m10 p/l of 40mm thick cement concrete flooring in m15 grade mix with 20mm n/s of stone agg with floating coat of neat cement. centering shuttering i/c strutting propping and removal of formwork carriage of sand bajri by mt avg lead of 15 kms add provision for pg/sb
Sector: RDPR