Details: earth work in excavation by mechnical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) exceeding 10 sqm on plan, including dressing of sides and ramming of the bottom lift upto 1.5 m and disposal of surplus excavated earth with in 50 m lead. p/laying stone soling duly hand packed and consolidated with hand rammers including all carriages complete job. p/laying in position cement concrete of specified grade including curing but excluding the cost of centering shuttering. all works up to plinth level in 1:3:6 mix with 20 mm aggregate. p/laying 20% plums. 12 mm thick cement plaster in 1:6 mix curing complete. centering and shuttering including strutting, propping etc. and removal of same work. carriage of bajree by m transport 30 kms to site of work. add provision for signboard/photograph charges etc.
Sector: RDPR