Details: earth work in trench excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m 2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil providing/laying stone soling nallah hand packed on level in foundation trenches excluding carriages of stones. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: (1:4:8 ) stone aggregate 40mm nominal size aggregate. centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns etc. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) brick work with common bur
Sector: RDPR