Details: site clearance by the way of engagement of labors including surface excavation and removal of shrubs hurbs etc. earthwork in excavation by manual means including disposal of excavated earth upto 1m from cutting edge,disposed earth to be levelled and neatly dressed. p/l of stone soling in bed tightly hand packed. providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using m10 mix. (1:3:6) and by using 20 mm down aggregates. p/f of shuttering using ordinary timber planks of wood including its removal. carriage of sand/crushed aggregate by mt, av lead of 10km @1.36 carriage of cement sign board and photographic charges
Sector: RDPR