Details: earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge in 30% ordinary rock & 70% all kinds of soil. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) demolishing c.c. & devri stone manually means including disposal of material within 50 m lead as per direction of engineer in charge (1:3:6 or richer) providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 15mm cement plaster of mix: 1 : 4 ( 1 cement : 4 coarse sand) centerin
Sector: Religious building