Details: earth work in excavation by manual means in trenches for foundations,drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, includingdressing of sides and ramming of bottoms lift upto 1.5 m, including gettingout excavated earth and disposal of surplus excavated earth as directed all kinds of soil : p/l of stone soling / rbm including all carriages.by mt10km avg lead providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: in 1:3:6 using 40mm nominal size aggregate.with 20% plum brick work with common burnt clay (non-modular) bricks of class designation 7.5 infoundation and plinth including curing in :cement mortar 1:6 ( 1 cement : 6 coarse sand) extra for brickwork with common burnt clay bricks in superstructure above plinth level upto floor five level providing and laying in position specified grade
Sector: RDPR