Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:akos providing and laying 1:3:6 mix c/conc providing and laying cement plaster15mm thick 1:6 mix providing and laying cement concrete flooring 1:2:4 mix centring and shuttering carriage of sand from an avg distance of 20 km by mt & 800 mtr hl add cost of sign board
Sector: RDPR