Details: earth work in bulk excavation by manual means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m sq. on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byengineer-in-charge. all kinds of soil : incliding all lead lift and carrige.( complete job) providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- all work upto plinth level.1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. all works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- all work upto plinth level 1:3:6 (1 cement: 3 c
Sector: PWD