Details: earth work in excavatioh by mannual mans in trenches for foundations drain, pipes, cables etc (not exceeding 1:5 mm width for forshafts, wells, cesspits and the like not exceeding 10sqm on plan, incl, dresing ofsides and ramming ofbottoms lift upto 1.5m incl, getting out excavated earth and disposal of surplus excavated earth as directed all kinds ofsoil 1 meter from cutting edge) add for extra one lift byound 1st 1.50 mtrs lift providing and laying of dry stone solling hand packed tightly including carriage by mt for an average of 30kms. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) providing and laying in position of reinforement cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:2:4 (1 cement :
Sector: RDPR