Details: earthwork in excavation by manual means in trenches for foundations, drains, cables etc (not exceeding 1.5m in width) and for shafts, wells ,cesspits and like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m including getting out excavated earth andf disposal of surplus excavated earth as directed providing and laying of dry stone soling hand packed in foundations incl carriage by mt centering and shuttering incl strutting ,propping etc and removal of formwork centering and shuttering incl strutting ,propping etc and removal of formwork for suspended floors, balconies etc providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. all work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) providing and laying in position reinforced cement concrete of specified grade including curing butexcluding the cost of centrin
Sector: RDPR